Pig Tracking

Minimize
 
ECDA Surveys

Minimize
 
Pipeline Integrity

Minimize
 
Shamus McDonnell
Shamus McDonnell
 
As CEO of Hunter McDonnell Pipeline Services (HM), Shamus’ knowledge of integrity surveys include data collection, correlation and validation through excavation for leak surveys, depth of cover surveys, cathodic protection surveys, inline inspection surveys, coating condition surveys and GPS surveys. His extensive experience within North America has led to technological advancements in the industry and several opportunities for course instruction and published papers.
 
Comprehensive data management is key to HM’s success as an established leader of pipeline pigging and integrity services. HM's databases currently manage data for more than 60 pipeline systems comprised of more than 100 pipeline sections, totaling over 10,000 miles of pipeline. HM also manages over 30,000 miles of ILI data with over 6,500 anomaly investigation and repair digs. The database utilizes 11 different ILI vendors and five different ILI technologies, plus a multitude of different NDE and customized data formats.
 
Work Experience
Apr 01, 1995 to Present Hunter McDonnell Pipeline Services Inc. – President & CEO
- Manage business and coordinate projects involving pipeline integrity consulting, dig site chaining, GPS locating, pipeline pigging, ECDA surveys, technology research and development. Major projects include:
Nov 01, 06 - United States DOT OPS – Plantation Pipeline Safety Audit and Consulting to OPS
- Audit of KMEP pipeline integrity program and it's compliance with OPS regulations for detection of seam weld defects.
Oct 01, 06 – BP Exploration - Alaska
- Audit and consulting for pipeline integrity program and it's compliance with OPS regulations after March ’06 failure.
Mar 01, 05 - United States DOT OPS - KMEP Safety Task Force
- Leadership role in the audit of KMEP pipeline integrity program and it's compliance with OPS regulations.
Feb 01, 05 – ATCO Pipelines
- Project coordinator for ECDA Inspection of non-piggable high profile urban pipelines.
Jun 01, 00 - Olympic Pipeline Company Post Failure Consulting
- Provided ILI analysis, correlation and consulting to ensure fitness of pipeline for return to service after Bellingham failure.
Jul 01, 99 - TransCanada Midstream
- BoundaryLake Pipeline Rehabilitation program; conducted ILI survey, prepared integrity program and executed dig/repair program.
Jul 01, 99 - Conoco
- Pioneer Pipeline ILI and dig evaluation and repair program.
Sep 01, 96 - AEC AOSPL
- Dig Evaluation Program
Jun 01, 96 - IPL Line 9 ILI Log Correlation Program
- Combined British Gas, Tuboscope and Pigco survey logs to identify areas of corrosion growth and cumulative defects.
Dec 01, 95 - IPL Line 9 ILI Survey and Log Correlation
- Coordinated tracking of four tools in three sections of pipeline; run simultaneously.
Aug 01, 95 - IPL Line 9 ILI Log Evaluation
- Assessed previous integrity data, including MFL corrosion logs, caliper logs and dig evaluation logs.
Jul 01, 95 - Gulf Canada Resources
- Coordinated integrity evaluation of Westerose Mainline - C-Scan coating survey, CP survey, ILI survey, and 110 dig/repair program.
May 01, 1990 to Apr 01, 1995 Corrpro Canada Inc. - Corrosion Technician
- Worked in Integrity group doing ILI log analysis, coating surveys, pipeline pigging project management and dig site evaluations.
Jul 01, 1985 to Sep 01, 1989 Wild Rose Recycling - Laborer
- Oilfield cleanup and recycling, pipeline and gas plant demolition and salvage.
 
 
Pipeline Failure Inspections and Consulting Projects
Consulted to both operators and regulators on the following projects:
2006 – 2007 BP Exploration (BPXA) BPXA Pipelines at Prudhoe Bay, Alaska,
2006 – 2007 PHMSA - OPS / DOT - 12” Kinder Morgan Energy Partners 14W PlantationPipelineBarringtonBridge
2006   MarkWest - Maytown, Kentucky                                      
2005   PHMSA - OPS/DOT:Kinder Morgan Energy Partners - 14" LS 25, Suisan Marsh
                                    Kinder Morgan Energy Partners - 14" Cal-Nev, Basin Road
                                    Kinder Morgan Energy Partners - 12" LS 42, Oakland
                                                                                Estuary
                                    Kinder Morgan Energy Partners - 8" LS 12, Donner Summit
2004 – 2005 Suncor Energy Partners - Suncor Oil Sands Pipeline SCC Failure
2000 – 2001 Potomac Electric Power Company (PEPCO) - Maryland release into river and wetlands          
2000 – 2005 Olympic Pipeline Company - Bellingham, Washington release at Watcom Creek                    
 
Published Papers
2007            World Pipelines - February 2007    Not an Impossible Inspection
2006            Pipeline and Gas Technology - March 2007   The Impossible Inspection
2006            Pipeline and Gas Technology - Nov/Dec 2006   Pig Tracking Via The Internet
2005            Pipeline Pigging Conference   Pipeline Pig Tracking Through The Internet, A New Use For Existing Technology In The Pipeline Pigging Industry (IPC-04-0398)
2004            International Pipeline Conference   Improvements And Modifications To Electromagnetic Pipeline Surveys (IPC04-0555)
2004            International Pipeline Conference    Pipeline Pig Tracking Through The Internet, A New Use For Existing Technology In The Pipeline Pigging Industry (IPC-04-0398)
2004            International Pipeline Conference   ADAPS: Anomaly Dimension And Position System (IPC04-0229)
2002            International Pipeline Conference    PIPELINE ALIAS - A Universal Nomenclature System For The Pipeline Industry (IPC02-27362)
2000            NACE Western Conference   Calculated Failure Pressures from Low or Standard Resolution ILI Logs
2000            NACE Western Conference   Correlation of Different Inline Inspection Logs to Identify Corrosion Growth and Cumulative Defects
 
Instructed Seminars             
2007            January Integrity Seminar on ECDA Indirect Inspections                   
2006            GrantMacEwanCollege: Supply Chain Transportation - Pipeline Economics
2005            Pipeline Inspection Seminar: ECDA and ILI Inspections & Tolerances         
2005            Banff P/L Integrity Workshop - ECDA Indirect Assessment and P/L Coating Inspection on Buried P/Ls
2004            GrantMacEwanCollege: Supply Chain Transportation - Pipeline Economics
2003            IIR 2003 – Abu Dhabi, UAE           2 Day Pipeline Pigging
                   IIR 2003 – Abu Dhabi, UAE          3 Day Pipeline Integrity
2001            IIR 2001 - Dubai, UAE 2 Day Pipeline Pigging
                   IIR 2001 - Dubai, UAE 3 Day Pipeline Integrity
1995 – 2007 Hunter McDonnell Internal AllStars Courses:    
                 3 Day Pipeline Integrity
                 1 Day Failure Pressure Calculations
                 2 Day NDE and Dig Investigation
                 1 Day Pipeline Pigging
                 1 Day Pipeline Pig Tracking
                 2 Day ILI Data Analysis and Correlation
                 3 Day ECDA and Indirect Inspections
 
Committees   
2005            Panel Member for PHMSA/OPS Public Meeting: Applying, Interpreting, and Evaluating Data from In-Line Inspection Devices
2005            Leader on PHMSA - KMEP Safety Task Force
2004            Worked on PODS committee for development of ILI data exchange model.
2003            Worked with committee and design team from across industry to develop and release Pipeline ADAPS
2002            Worked with committee and design team from across industry to develop and release Pipeline ALIAS
2001-2007   Led development and field testing of Internet based pig tracking system, trade named Armadillo
2000            Developed Pipeline Joint Numbering Convention and released for public use.
2000 – 2007 Led development of R&D Project PISCES, led to development of Spectrum XLI (External Line Inspection) technology for ECDA indirect inspections of pipelines
 
Patents (or Patents Pending)           
2007            Co-Inventor for patent application for CIS data gathering and analysis methodology
2007            Co-Inventor for patent application for ILI Benchmarking methodology
2006            Co-Inventor for patent application for ECDA indirect inspection data gathering system methodology
2006            Co-Inventor for patent application for ECDA indirect inspection devic
Print  Minimize
 
 

Canmore, AB

Co-founder, President & CEO of Hunter McDonnell Pipeline Services Inc. (1995)

Print  Minimize